Moolarben Coal Water Treatment Facility

Client: YancoalDuration: 10 monthsLocation: Moolarben, NSW

  • Construction of civil works associated with the new CHPP Water Treatment Facility. The project included work both inside and outside of the Moolarben rail balloon loop, including regular interaction with live rail operations
  • Project completed ahead of programme and below client’s budget cost
  • Zero reportable incidents or LTI
  • Key Scope included:
    • Design and construction of three HDPE-lined brine dams (two with leak detection systems), totalling 120,000m2;
    • Continuous work around a live rail balloon loop, including upgrading and HDPE lining a portion on the internal batter;
    • Un-signalised rail crossing
    • 260,000m3 of bulk earthworks to dams WP19, 20 and 21
    • Piped drainage installation;
    • Rock-lined open drains;
    • Pavement construction and surfacing;

Get In Touch

Port Macquarie Office

6/147 Gordon Street,
Port Macquarie NSW

Tuncurry - Head Office

8 Dee Crescent,
Tuncurry NSW 2428

Newcastle Office

Unit 8 / 12 Channel Road,
Mayfield West NSW 2304

Scroll to Top